Shipwrecked! An Entertainment. University of Virginia- Caplin Stage
Role: Technical Director
This show appeared to be simple at first- fairly straightforward set construction. Two elements popped up that were a bit more unusual- the design called for rough cut lumber, and for two 16 foot long wooden beams to fly in and out during the show in a space without a rigging system. After many phone calls to lumberyards and some practice on some Creative Conners winches, both of those requests became realities.
Construction

Shipwrecked

End of the first day of load-in. The center platform framing and legs are in place.

After the second day of load-in, the top of the platforms are covered with plywood and the railing posts have been installed.

And hey presto, the wheels are getting a rubber tread glued to the rim.

End of the first day of load-in. The center platform framing and legs are in place.